Construction, installation and execution of the piping of the iron smelting plant
IN in progress, terminated
Investor Name:
Published Date:
1970-01-01
Location:
ذوب آهن اصفهان
Value:
Architecture:
About Project
Place of execution: Zob Ahan Isfahan Main employer: Mapna Second employer: Insal Niro Start date: 10/01/1401 Operation description: 1- Welding polyethylene pipe about 60,000 inches 2- Construction and installation of Sassaport about 25,000 kg 3- Valve installation about 750 Number 4- Sandblasting and painting about 500,000 kg