03134585418
Construction, installation and implementation of gas piping system of Fars power plant
IN terminated
Investor Name:
Published Date:
1970-01-01
Location:
Value:
Architecture:
About Project
Project Name: Construction, installation and implementation of the gas, diesel, steam, condensate, fire fighting system of the 1,000 MW Fars gas power plant, which was delivered to the client in 2019. Including: installation of gas pressure reduction stations, installation of forwarding and unloading pumps, installation of fire fighting containers, drilling and piping of high-pressure underground water network and installation of all hydrant valves… 1- Carbon steel and galvanized welding operation more than 50,000 inches in diameter 2- Construction and installation of support about 38,000 kg 3- Installation of 2 fire fighting containers, installation of 14 centrifugal pumps 4- Installation of two auxiliary boilers with a capacity of 5 tons each 5- Installation of auxiliary boiler equipment of about 45,000 kg 6- Implementation of earthworks including drilling, sandblasting, concreting, backfilling about 17,000 cubic meters 7- welding polyethylene pipes with 16 bar pressure about 20,000 inches in diameter and 10 bar pressure pipes 4,000 meters long