Construction, installation and implementation of the gas piping system of Semnan gas power plant
IN terminated
Investor Name:
Published Date:
1970-01-01
Location:
Value:
Architecture:
About Project
Name of the project: construction, installation and implementation of gas, diesel, steam, condensate, firefighting piping system of Semnan gas power plant, which was delivered to the client in 2019, including: installation of forwarding and unloading pumps, installation of firefighting containers, drilling and network piping underground with high water pressure and installation of all hydrant valves and… 1- Carbon steel and galvanized welding operation of more than 40,000 inches in diameter, which includes firefighting piping, fuel, steam, condensate, 5 tanks of 20,000 cubic meters 2- Support construction and installation about 40,000 kg 3- Installation of 2 fire fighting containers, installation of 10 centrifugal pumps, installation of 2 auxiliary boilers with a capacity of 5 tons each 4- Installation of auxiliary boiler equipment of about 45,000 kg 5- Implementation of earth operations including drilling, sandblasting, concrete Rezi, Backfill about 22,000 cubic meters 6- Welding polyethylene pipes with a pressure of 16 bar about 22,000 inches in diameter and pipes with a pressure of 10 bar 8,000 meters long