Construction, installation and implementation of the gas piping system of Semnan gas power plant

Construction, installation and implementation of the gas piping system of Semnan gas power plant

IN terminated
Investor Name:
Published Date:
1970-01-01
Location:
Value:
Architecture:
About Project

Name of the project: construction, installation and implementation of gas, diesel, steam, condensate, firefighting piping system of Semnan gas power plant, which was delivered to the client in 2019, including: installation of forwarding and unloading pumps, installation of firefighting containers, drilling and network piping underground with high water pressure and installation of all hydrant valves and… 1- Carbon steel and galvanized welding operation of more than 40,000 inches in diameter, which includes firefighting piping, fuel, steam, condensate, 5 tanks of 20,000 cubic meters 2- Support construction and installation about 40,000 kg 3- Installation of 2 fire fighting containers, installation of 10 centrifugal pumps, installation of 2 auxiliary boilers with a capacity of 5 tons each 4- Installation of auxiliary boiler equipment of about 45,000 kg 5- Implementation of earth operations including drilling, sandblasting, concrete Rezi, Backfill about 22,000 cubic meters 6- Welding polyethylene pipes with a pressure of 16 bar about 22,000 inches in diameter and pipes with a pressure of 10 bar 8,000 meters long