03134585418
Construction, installation and implementation of the gas piping system of Shahrood gas power plant
IN terminated
Investor Name:
Published Date:
1970-01-01
Location:
Value:
Architecture:
About Project
Project Name: Construction, installation and implementation of gas, diesel, steam, condensate piping system for Shahrood gas power plant including: installation of forwarding and unloading pumps, installation of fire fighting containers, drilling and piping of high pressure underground water network and installation of all valves hydrant and… 1- Carbon steel and galvanized welding operation more than 30,000 inches in diameter, which includes firefighting fuel, steam, condensate piping, 3 tanks of 20,000 cubic meters 2- Installation of 2 firefighting containers, installation of 12 centrifugal pumps, installation 2 auxiliary boilers with a capacity of 5 tons each 3- Construction and installation of supports of about 40,000 kg, sand blasting of pipe paint of about 15,000 square meters and sand blasting and support paint of about 40,000 kg 4- Installation of auxiliary boiler equipment of about 45,000 kg 5- Implementation of operations Soil includes digging, soil transportation, sandblasting, concreting, backfill about 15,000 cubic meters. 6- Welding of polyethylene pipes with 16 bar pressure, about 22,000 inches in diameter and pipes with 10 bar pressure, 8,000 meters long.