Construction, installation and implementation of the gas piping system of Shahrood gas power plant

Construction, installation and implementation of the gas piping system of Shahrood gas power plant

IN terminated
Investor Name:
Published Date:
1970-01-01
Location:
Value:
Architecture:
About Project

Project Name: Construction, installation and implementation of gas, diesel, steam, condensate piping system for Shahrood gas power plant including: installation of forwarding and unloading pumps, installation of fire fighting containers, drilling and piping of high pressure underground water network and installation of all valves hydrant and… 1- Carbon steel and galvanized welding operation more than 30,000 inches in diameter, which includes firefighting fuel, steam, condensate piping, 3 tanks of 20,000 cubic meters 2- Installation of 2 firefighting containers, installation of 12 centrifugal pumps, installation 2 auxiliary boilers with a capacity of 5 tons each 3- Construction and installation of supports of about 40,000 kg, sand blasting of pipe paint of about 15,000 square meters and sand blasting and support paint of about 40,000 kg 4- Installation of auxiliary boiler equipment of about 45,000 kg 5- Implementation of operations Soil includes digging, soil transportation, sandblasting, concreting, backfill about 15,000 cubic meters. 6- Welding of polyethylene pipes with 16 bar pressure, about 22,000 inches in diameter and pipes with 10 bar pressure, 8,000 meters long.