پایدار انرژی پایندان - خدمات مشاوره، طراحی، مهندسی، ساخت، تامین، نصب ، راه اندازی و بهره برداری

Enter your keyword

Get a quote

[mc4wp_form]

Construction, installation and implementation of the preheater system of the Ahvaz desalination project

Construction, installation and implementation of the preheater system of the Ahvaz desalination project

IN terminated
Investor Name:
Published Date:
1970-01-01
Location:
Value:
Architecture:
About Project

Name of the project: construction, installation and implementation of the preheater system of the Ahvaz 1 and 4 desalination project, which was delivered to the client in 1993, including: 1- installation of 8 heaters weighing 48,0000 kg 2- carbon welding about 16,000 inches in diameter , construction and installation of support and platform about 35,000 kg 3- Sandblasting and painting of lines about 10,000 meters 4- Hydrotesting and flushing about 65,000 inch meters 5- Implementation of hot tap operations to connect new lines to the main line of the operator 6- Pishrah Setting up and running the entire system