پایدار انرژی پایندان - خدمات مشاوره، طراحی، مهندسی، ساخت، تامین، نصب ، راه اندازی و بهره برداری

Enter your keyword

Get a quote

[mc4wp_form]

Construction, installation and operation of Cheshme Khosh oil and gas system

Construction, installation and operation of Cheshme Khosh oil and gas system

IN terminated
Investor Name:
Published Date:
1970-01-01
Location:
Value:
Architecture:
About Project

Including: construction, installation and implementation of piping and commissioning of Cheshme Khosh project oil and gas system 1- carbon steel welding operation 65,000 inches in diameter 2- installation of pressure tanks weighing more than 120,000 kg 3- installation of more than 400 pieces of control equipment and panels Power and conducting related tests, amounting to 42,000 meters 4- Pre-commissioning operation and setting up the system and one-year operation of the equipment 5- Internal cabling operation of the cable tray and termination and conducting related tests 6- Sandblasting and paint Mixing lines of about 15,000 square meters 7- Hydrotesting and flushing Verinstat about 130,000 square meters 8- Implementation of hot tap operation to connect new lines to the main line of the operator