Installation and delivery operation of metal structure of Qeshm power plant

Installation and delivery operation of metal structure of Qeshm power plant

IN terminated
portfolio
Investor Name:
Published Date:
1970-01-01
Location:
Value:
Architecture:
About Project

Delivery time: 25/02/1402 Main client: Mina Tehsehe 3 Second client: Fabco Description: 1- Installation of metal frame of about 900,000 carpentry hall with crane supply 2- Sandblasting and painting of about 550 tons 3- Moving parts from the depot to the foot Work 4- Installation of 17,113 bolts and nuts related to the structure