Installation and operation of dynamic MDF production line of Ghaemshahr wood
Installation and operation of dynamic MDF production line of Ghaemshahr wood
IN terminated
Investor Name:
Published Date:
1970-01-01
Location:
Value:
Architecture:
About Project
Including: 1- Installation of all the equipment of the Star Cooler section along with pre-startup of about 250,000 kg 2- Installation and assembly of the silo section of about 70,000 kg