03134585418
Purchase, construction, installation and implementation of piping and equipment related to the water treatment plant, compact fire fighting systems, conical system and Bop lines of Assalouye power plant.
IN terminated
Investor Name:
Published Date:
1970-01-01
Location:
Value:
Architecture:
About Project
Place of execution: Bop Asalouye power plant Main employer: Mapna Development One Completion date: 1399/12/28 Description: 1- Installation of water treatment plant equipment, wtp, cpp, room compressor, fire fighting about 120,000 kg 2- Implementation of earth operations including digging, sand Plastering, concreting, backfill about 22,000 cubic meters 3- Welding polyethylene pipes with 16 bar pressure, about 22,000 inches diameter and 10 bar pressure pipes 8,000 meters long 4- Implementation of metal pipes 42,000 inches diameter 5- Construction and installation Support about 40,000 kg