The construction, installation and commissioning project of Chehelston, Isfahan
IN terminated
Investor Name:
Published Date:
1970-01-01
Location:
Value:
Architecture:
About Project
The project of construction, installation, commissioning and implementation of piping systems for gas, diesel, fire fighting water and drinking water and service water of Chehelston combined cycle power plant in Isfahan, including: installation of pumps and forwarding equipment, unloading, installation of fire fighting containers and installation of executive operation volume equipment The project is as follows: A: carbon welding operation 35,000 inches in diameter, polyethylene welding operation 11,000 inches in diameter B: construction and installation of support more than 25,000 kg, installation of equipment more than 50,000 kg C: soil operation 11,000 cubic meters, insulation 15,000 square meters, sand blast and paint 20,000 square meters